Today we made it to the half way point I think. I could never have done this without Mike.
The back of the house just before we took off the last of the siding, which is the small white section on the left.
The back of the pile is aluminum, and there are approximately 22 garbage bags filled with about 30 lbs each of asbestos siding. The yellow jackets! At one point I had a can of 22 ft. range foaming wasp and hornet killer in one hand and a can of flying insect killer spray in the other. I also put out two containers (ice cream pails with lid and a small hole in the side.)with mountain dew in them. By the end of the day there must have been at least 70 yellow jackets drowned inside. Of course this doesn't effect the population around the house in the least.
No comments:
Post a Comment